
The Techint Group, commanded by the Tsar of the Paolo Rocca steel does not stop attacking its workers.
The turn now touches Villa Constitución, the Tenaris Siat plant that is located there. City that is already beaten with the loss of hundreds of jobs in Acindar, workshops, shops and works.
The businessman who financed Javier Milei’s campaign and put 8 first -line officials, today is faced by the tariffs imposed by the United States for the importation of steel in the northern country. But despite everything, he continues to support the adjustment to be able to pass his own chainsaw on his plants to remove rights, eliminate positions and deepen precariousness and flexibility.
The crisis that the steel industry is going through cannot be attributed to anything other than capitalist businesses. Both the Techint Group and the Arceormittal acindar group are not going through any financial or economic crisis. They are investing in other businesses and wanting to discipline steel workers. They want to eliminate the resistance found in each step that want to advance with the desired labor reform.
It is for this reason that we must redouble the efforts to face these monsters with the broadest unity and coordination between all sectors that want to fight to defeat these employers and the entire economic plan of Milei, Trump and the IMF.
Organized from below, holding assemblies, imposing the distribution of work hours without affecting the salary, going to the streets to tell the truth to the population is the only way that this attack can be faced. There is no “minor evil” to choose from. Any other exit that does not definitely defeat the economic plan as a whole, will generate hardships to the working people.
Source: www.laizquierdadiario.com